Icon Créer jeu Créer jeu

Quiz de Logística SAP

Test

Demuestra tus conocimientos sobre SAP Logística con este divertido juego de preguntas y respuestas.

Obtenez la version papier pour jouer

18 fois fait

Créé par

Spain

Top 10 résultats

  1. 1
    01:12
    temps
    100
    but
Voulez-vous apparaître dans le Top 10 de ce jeu? pour vous identifier.
Créez votre propre jeu gratuite à partir de notre créateur de jeu
Affrontez vos amis pour voir qui obtient le meilleur score dans ce jeu

Top Jeux

  1. temps
    but
  1. temps
    but
temps
but
temps
but
 
game-icon

Quiz de Logística SAPVersion en ligne

Demuestra tus conocimientos sobre SAP Logística con este divertido juego de preguntas y respuestas.

par Carlos Vizcaino
1

The SAP Fiori UX is only available for expert users.

2

The long-term goal of the SAP UX strategy is to offer only major business and analytic applications on SAP HANA SAP Fiori as the unified UI.

3

You can use groups, spaces and pages in parallel in your SAP FIori Launchpad when configured properly.

4

The SAP GUI is still available in S/4HANA as an alternative navigation option. Determine whether this statement is true or false.

5

SAP Business Client can only display SAP GUI transactions. Determine whether this statement is true or false.

6

Which of the following objects can you maintain in the Project Builder? Choose the correct answers.

Escoge una o varias respuestas

7

WBS elements can be linked together using relationships in order to specify the chronological order of WBS elements.

8

Which factors can have an influence on the scheduling result of networks? Choose the correct answers.

Escoge una o varias respuestas

9

If “Bottom-up” is selected as the scheduling scenario, what happens to the activity dates?

10

The system determines the order of FS relationships based on how activities are displayed in the planning board (from top to bottom).

11

Activity elements are scheduled independently of the higher-level activity. Determine whether this statement is true or false.

12

The free float is the difference between the earliest finish date for an activity and the earliest start date for the successor.

13

The system carries out check available capacities when using the reduction function

14

One of the ways in which actual dates for a WBS element can be calculated is by extrapolation of actual dates of lower-ranked WBS elements.

15

The system automatically calculates the actual dates for a WBS element from the accounting documents assigned to the WBS element.

16

The Shift order indicator controls how actual dates from final confirmations affect further scheduling runs.

17

Which technology is used by the Project Schedule app

18

In the Project System, only personnel resources represent capacities.

19

Which two of the following key settings influence the calculation of capacity requirement?

Escoge una o varias respuestas

20

Which of the following prerequisites need to be met to analyze the capacity requirements of an activity?

Escoge una o varias respuestas

21

In the capacity reports for the Structures Information System, all requirements are displayed for the resources selected.

22

On the Capacity Planning: Standard Overview screen, which menu path finds all capacity requirements for your project?

23

The tabular capacity planning board can be called up in which of the following views? Choose the correct answers.

Escoge una o varias respuestas

24

If you want to distribute work to persons in a project organization for a certain project, you need to assign this project organization for all WBS elements of the project.

25

Which options are available for confirmations of network activities in the Project System?

Escoge una o varias respuestas

26

With collective confirmation, you can simultaneously confirm the following: various networks, activities, activity elements, and individual capacities

27

Which two of the following conditions need to be met in order for the system to automatically trigger a workflow?

Escoge una o varias respuestas

28

Data entry profiles allow the user to define the layouts and different functions of CATS.

29

The system always generates a purchase order automatically when releasing an externally processed activity

30

Which one of the following is used to record services performed

31

If you want to increase stock and use the components in the network at a later stage, which item category should you choose?

32

Most of the selection parameter settings for the BOM transfer can be preassigned in the BOM transfer profile in Customizing. However, the priorities for the stock segments, the check of the requirements dates, and the selection date for logs, cannot be preassigned

33

Which of the following statements are correct for the assignment of material components to network activities?

Escoge una o varias respuestas

34

Item category C (planning element, no inventory management) is assigned for components that are assigned using a catalog interface

35

The BAdl BADI_MAT_CUST_SCR allows you to create customer-defined fields for the assigned material.

36

For the direct procurement of non-stock items, you must use the valuated project stock. Determine whether this statement is true or false.

37

When stock items are procured via requirements planning, the components are always produced in-house.

38

When creating a third-party purchase order, which one of the following needs to be maintained in the system?

39

Which of the following menu paths is used to open the stock/ requirements list? Choose the correct answer

40

Which item category must you use when assigning your components to ensure that stock can be managed?

41

Which of the following statements concerning requirements grouping are correct?

Escoge una o varias respuestas

42

Which checking rule element determines which stocks, issues, and receipts will be taken into account in the availability check?

43

You can select components by specifying any of the following: the project definition, the WBS element, a sales order, or a network

44

Which three of the following data entries allow you to limit the selection of material components for delivery?

Escoge una o varias respuestas

45

Which of the following statements concerning ProMan are correct?

Escoge una o varias respuestas

46

Dates that you wish to analyze in Progress Tracking have to be manually entered into the various events beforehand

47

When compared to date monitoring, Progress Tracking was improved by which of the following developments?

Escoge una o varias respuestas

48

The interface GET_REFERENCE_DATE can be used to automatically derive dates for events in progress tracking. Which BAdl do you use to access this interface?