Créer jeu
Jouer Froggy Jumps
1. The Cheesegrater
A
B
C
2. Leadenhall Building is...
A
the tallest office building in the city
B
a 215-metre-tall
C
nicknamed the Dalek
3. Was designed by
A
Arup
B
Aedas
C
Rogers Stirk Harbour+Partners
4. Choose the correct answer
A
Instead of having a massive central core, the building has a steel exoskeleton
B
The construction of the building involved 26000 t of steel
C
The construction of building was 50% complete in December 2014
5. Choose the wrong fact
A
Elevator speed:8 m/s
B
Floors: 49
C
The building construction produced almost zero waste
6. Leadenhall Building located in...
A
London
B
Leeds
C
Manchester
7. The deadline for the construction was
A
2014
B
before the end of 2012
C
before the end of 2013
8. The Cheesegrater puts all its services, elevators, restrooms and all the mechanical and electrical system at
A
the center of the building
B
the back of the building
C
the front of the building